Swissmade
NEWS
25/06/2020
CORPORATE

Z43 Goes Carbon Dioxide-Free

As part of our effort to help create a sustainable and healthier future, energy at Z43 is now 100% renewable, which will lead to a reduction in CO2 emissions of more than 60,000 m3 per year – corresponding to about twenty times the CO2 footprint of the average Swiss.

For the past 20 years, we have produced the heating energy for the Z43 headquarters in Zurich – home to the IT’IS Foundation, Schmid & Partner Engineering AG, and ZMT Zurich MedTech AG – as well as supplied adjacent residential buildings with more than 79 apartments with natural gas. Our labs, on the other hand, were cooled via a small heat pump powered by electricity. Though gas is “cleaner” than oil or coal, we strongly felt that it was time to switch from fossil fuels to renewable sources of power in order to run our work lives more sustainably.

niels roof panels web

niels basement heating web

So we finally got rid of the gas burners in our basement and invested heavily in a new energy system. The newly installed 500 kW heat pump now heats and cools the various buildings by exchanging heat with the groundwater stream that runs 30 m below our premises. In addition, because our labs and servers produce more heating energy than we can use during the summer, we replaced the warm-water panels on the roof with photovoltaic cells to generate our electric power. We also took care to only subscribe to companies that exclusively generate electricity by hydro, wind, and solar power. This complements our internal policy that Z43 staff should only commute by car to work in exceptional circumstances (e.g., it was appropriate to do so during the COVID-19 pandemic).

We are proud that we have started to generate our own energy and have become largely CO2-free at Z43.

Curious how it looks? Check out our CO2-free energy production by clicking on the leaf:

leaf slogan mm3

The leaf can also be found in the header of any of our webpages: IT’IS Foundation, SPEAG, ZMT, and Zurich43.

Z43 – Think Renewable!

MEASUREMENT

21/03/2016

Contact
info@speag.swiss

 

Chinese OTA Hand Phantoms

Release of the first Chinese OTA hand phantom developed in collaboration with HWA-Tech for the Chinese Academy of Broadcasting Planning (ABP).

 
CORPORATE

11/03/2016

Contact
info@speag.swiss

 

SPEAG Fast SAR Solutions Featured at MIC MRA Workshop in Tokyo

The performance of SPEAG’s products for fast measurement of specific absorption rate (SAR) – DASY6 and cSAR3D – were featured in a presentation by Prof. Niels Kuster at the MIC MRA International Workshop held March 2 – 3, 2016 in Tokyo hosted by the Japanese Ministry of Internal Affairs and Communications.

 
SIMULATION

08/03/2016

Contact
semx-support@speag.swiss

 

SEMCAD Matterhorn V15.6.3 Update Release

The SEMCAD X Team is pleased to announce the release of SEMCAD Matterhorn V15.6.3, an updated version of SEMCAD Matterhorn  V15.6.

 
MEASUREMENT

23/02/2016

Contact
info@speag.swiss

 

Still Groovin’ to the E-Field Probe Blues by Prof. Howard Bassen

The first paper to describe the design and fabrication of a miniature broad-band electric field probe was published more than 40 years ago in the Annals of the New York Academy of Sciences, Biological Effects of Nonionizing Radiation.

 
MEASUREMENT

10/02/2016

Contact
info@speag.swiss

 

Anritsu MT8820C Integrates with DASY6 and cSAR3D

Anritsu Corporation’s MT8820C Radio Communication Analyzer now integrates with both DASY6 and cSAR3D from Schmid & Partner Engineering AG (SPEAG) to provide seamless Specific Absorption Rate (SAR) compliance testing that significantly reduces assessment costs and maximizes flexibility.

 
MEASUREMENT

06/02/2016

Contact
info@speag.swiss

 

Notice: Limited warranty on phantoms

Important notice to avoid shell degradation of SPEAG phantoms due to exposure to aggressive liquids.

 
CORPORATE

04/02/2016

Contact
info@speag.swiss

 

IT'IS/Speag/ZMT Retreat in Melchsee-Frutt on Mastering Sales/Funding, Spotting Trends and Shaping the Future

Twenty IT'IS Foundation, SPEAG, and ZMT co-workers convened for two-day retreat, 01 – 02 February 2016, held at the Hotel Frutt Lodge & SPA, in Melchsee-Frutt, Canton Obwalden. The goal of the retreat was to learn how to spot trends and become a trend setter, to master sales, to assess the current status of the organization, and to establish measures for improvement.

 
CORPORATE

22/01/2016

Contact
info@speag.swiss

 

Let’s Party! Festivities to Kick Start 2016!

This year’s party of Z43 (IT'IS Foundation, SPEAG, ZMT) was held at trendy Art Dock, located in the former freight terminal between Zurich’s Hardbrücke and Central train stations.

 
SIMULATION

08/12/2015

Contact
semx-support@speag.swiss

 

SEMCAD Matterhorn V15.6 Released

The SEMCAD X Team is pleased to announce the release of SEMCAD Matterhorn V15.6, an update of SEMCAD Matterhorn  V15.4.

 
CORPORATE

12/11/2015

Contact
info@speag.swiss

 

National Future Day 2015 – Wireless Power Transfer with the Kids “Wonderful and Powerful Team”

Thursday, November 12 was 2015 Future Day at Z43, and six engaged and curious youngsters spent the day visiting our team at IT’IS, SPEAG, and ZMT laboratories.

 
Page 13 of 28